How Does a Purchase Plus Improvements Mortgage Work in Edmonton, Step by Step?

Quotes before you firm up, an as-improved appraisal, City permits, then the money held back until the work is done. Here's each step, and where it goes wrong.

By Josh Tagg ·

Couple in the half-finished basement of their older Edmonton home, new wood framing and drywall around them, holding a rolled plan

Quick answer: With purchase plus improvements, you buy an Edmonton home and finance the renovations in the same insured mortgage. You get contractor quotes before you remove conditions. The lender bases the mortgage on the lesser of the home’s as-improved value or the price plus the cost of the work. The renovation money is held back and released only after the work is done. On a $420,000 home with $40,000 of work, that’s a $23,000 minimum down payment, and $40,000 your contractor waits for or you carry until the money is released.

Most buyers understand the idea. Where files go wrong is the order of steps and who pays the contractor before the lender does. For whether a fixer-upper makes sense at all, see fixer-upper or move-in ready in Edmonton. This post is the how.

What happens at each step?

  1. Get quotes during your conditions. The lender approves specific work at a specific cost, so you need a written quote, with each item and a timeline, before you remove your financing condition. Several quotes help if the work is large.
  2. The lender orders an as-improved appraisal. The appraiser values the home as it will be once the work is done. CMHC sets the lending value as the lesser of that as-improved value or the as-is value plus the cost of the work (CMHC).
  3. You close on the home. The purchase funds on possession day. The renovation money stays with the lender or your lawyer.
  4. Pull permits and start the work. More on Edmonton permits below.
  5. The work is confirmed and the money is released. If the improvements cost 10% or less of the as-improved value, the money comes in a single advance after the work is done. Bigger jobs are paid in stages, called progress advances (CMHC). Ask your lender how long you have to finish and who signs off.

How much cash do you need, and what if the appraisal is low?

Here’s an example. The price, renovation cost and appraisals are illustrations.

Appraisal matches Appraisal comes in low
Purchase price $420,000 $420,000
Renovations (basement and flooring) $40,000 $40,000
Price plus renovations $460,000 $460,000
As-improved appraisal $465,000 $450,000
Lending value (the lesser of the two) $460,000 $450,000
Minimum down payment (5% of lending value) $23,000 $22,500
Mortgage before the CMHC premium $437,000 $427,500
Your cash toward price plus renovations $23,000 $32,500

A low appraisal costs this buyer $9,500 more cash, because the lender lends on $450,000 while the work and the home still cost $460,000. The minimum down payment is 5% of the first $500,000 and 10% above that, on homes under $1.5 million (CMHC). Closing costs are on top.

Here the $40,000 of work is under 10% of the as-improved value, so it’s paid in one advance once the work is finished. Until then, someone has to fund the work. Many contractors want a deposit and progress payments. Agree on how the contractor gets paid before you sign anything, and keep enough cash for the gap. CMHC also expects lenders to consider whether you can cover cost overruns.

Do you need City of Edmonton permits?

Often, yes. The City’s home renovation permits cover work such as interior alterations, kitchens, bathrooms, windows, exterior doors, and structural and framing changes (City of Edmonton). A basement development needs a building permit before an electrical permit will be issued (City of Edmonton), and it needs an HVAC permit too (City of Edmonton). A secondary suite takes longer than a plain basement development.

From July to September 2026, simple projects, including home renovations and basements, had a 25-day target and averaged 12 days. Secondary suites had a 40-day target and averaged 36 days (City of Edmonton). Build that time into the schedule before the lender’s clock starts.

From the builder’s side, keep the permits and inspection records together as the work goes. When it’s time to confirm the work is done, you’ll want them in one place, because nothing is released until it’s confirmed.

Where does purchase plus improvements go wrong?

  • The quote was too low. Old houses hide surprises behind walls. If the work costs more than approved, the extra is yours to pay.
  • The appraisal didn’t support the work. Some renovations add less value than they cost. A good REALTOR® can tell you what finished homes on the street sell for.
  • The contractor can’t wait to be paid. If they need payment before the money is released, you need the cash or a different plan.
  • The schedule slipped. Permits, materials and trades all take time. Ask what happens if you miss the lender’s completion deadline before you start.
  • The work wasn’t on the approved list. Changes mid-project can mean the finished home no longer matches what the appraiser valued.

When doesn’t this apply?

If the work is structural or very large, such as a major addition or rebuilding after damage, a renovation or construction mortgage may fit better. If you have 20% down, you don’t need insurance, and some lenders offer their own version with different rules. And if the improvements are small enough to pay from savings without hurting your down payment, it may be simpler to buy as is and renovate after.

What should you do next?

Before you write an offer on a home that needs work, talk to us and your contractor together. We’ll check the quote against what a lender will finance, what cash you’ll need for the gap, and how long the City and the lender will give you. Book a call.

This is commentary, not advice. Rules and permit times as of October 26, 2026. The prices, renovation costs and appraisals in the example are illustrations. All mortgages are subject to lender and insurer approval.

Frequently asked

How does a purchase plus improvements mortgage work?

You buy the home and finance agreed renovations in the same insured mortgage. The lender bases the loan on the lesser of the home's as-improved value or the price plus the cost of the work. The renovation money is held back and released once the work is done and confirmed.

When do I get the renovation money?

After the work is done. Under CMHC's rules, if the improvements cost 10% or less of the as-improved value, the money is paid in a single advance. Larger jobs are paid in stages, called progress advances. Until then you or your contractor carry the cost.

What if the appraisal comes in lower than the price plus renovations?

The lender uses the lower number. In our example, $40,000 of work on a $420,000 home appraised at $450,000 as improved instead of $460,000, which means about $9,500 more cash from you.

Do I need a permit for renovations in Edmonton?

For many projects, yes. The City's home renovation permits cover work such as interior alterations, kitchens, bathrooms, windows, exterior doors and structural changes. A basement development needs a building permit before the electrical permit is issued, and an HVAC permit too. From July to September 2026, simple renovation and basement permits averaged 12 days against a 25-day target.

Can I do the renovations myself?

Ask your lender before you plan on it. The lender needs a cost estimate for the approved work, and the work still has to be completed and confirmed before the money is released. In Edmonton, homeowners who aren't certified master electricians can't do some electrical work themselves.